2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    2024 LIUGONG SG70D New 其他2024 LIUGONG SG70D New 其他
    照片(14)

    2024 LIUGONG SG70D

    其他
    致电询价 

    Ganz

    联系人:David James

    Heatherbrae, 澳大利亚 2324

    常规

    分类
    其他
    年限
    2024
    制造商
    LIUGONG
    型号
    SG70D
    状况
    新建
    库存号
    SG 70 D
    描述
    Liugong SG70D Hydraulic Diaphragm Wall Grab CALL FOR PRICE LiuGong's The SG70D Hydraulic Diaphragm Wall Grab stands out with its imported Cummins QSM11 EFI turbocharged engine, offering powerful performance while maintaining low noise and emissions. The utilization of trusted and high-performance hydraulic components ensures reliability and stability. The double winch design enables faster lifting and lowering, improving slotting efficiency and fuel economy. The advanced programmable inclinometers enhance excavation monitoring and optimization. With energy-saving features and improved control system, the SG70D promotes high efficiency, deep trench excavation capability, and environmental sustainability. FEATURES CUMMINS QSM11 EFI TURBOCHARGED ENGINE & RELIABLE AND HIGH-PERFORMANCE HYDRAULIC COMPONENTS: The SG70D is equipped with an imported Cummins QSM11 EFI turbocharged engine, meeting Euro III emissions standards. This engine provides strong power, ensuring efficient and reliable performance during diaphragm wall construction. It operates with low noise levels and reduced emissions, promoting environmental friendliness. The SG70D features hydraulic components from well-known, reputable brands renowned for their reliability, stability, and high-performance. These components contribute to the grab's overall efficiency and productivity, ensuring smooth and precise operation. DOUBLE WINCH TYPE & ADVANCED PROGRAMMABLE INCLINOMETERS The SG70D utilizes a double winch design, enabling faster lifting and lowering speeds. This design enhances the slotting efficiency, resulting in increased productivity and reduced excavation time. The improved efficiency also contributes to fuel economy, reducing overall operating costs. The SG70D is equipped with advanced programmable inclinometers that record and store the excavation process of the grab. This feature enables efficient monitoring and analysis of the excavation operation, allowing for better control and optimization of the diaphragm wall construction process. As a result, the working efficiency is improved and the grab's ability for deep trench excavation is enhanced. SPECIFICATIONS: SG70D Wall width (m) :0.8~1.5 Max. depth (m) : 80Max. lifting force (kN) : 700 Single line pulling force (kN) : 2 x 350 Weight of grab (t) : 23.5-33.5 Total weight without grab (t) : 95 Dimension- Height (mm) :18,300 Max. height from grab to ground (mm) :5,500 Crawler length (mm) :5,820 Distance from grab center to slew cente (mm) :4675~5345 Distance from slew center to rear end (mm) 4,695 Base machine - Diesel engine:QSM11-Tier3 Max. engine speed (rpm) : 1,900 Rated power (kW) : 300 System pressure (MPa) : 35 System flow (L/min) : 2 x 380 Model :JT85 Track outer width (mm) : 3400~4580 Track shoe width (mm) :800Traction force (kN) :700 Walking speed (km/h) : 1.5