致电询价
常规
年限
2017
制造商
CATERPILLAR
型号
772G
小时
9,930
状况
二手
库存号
T2873
描述
22% Load Factor, 2,694 Neutral Hours, CAT C18 ACERT Engine, Automatic 7 Speed Transmission, Cab (ROPS) with A/C, Supplemental Steering, Cold Weather Arrangement, Oil Immersed Disc Brakes, Extended Life Brakes, 51 Ton/41 CYD Capacity, Truck Payload Management System, Flat Floor Body, Body Side Board Extensions, Heated Body, 21.00R33 Tires, Rear Michelin X-Tra Load Grip L4 Tires, Front Bridgestone VMTP L4 Tires, Automatic Retarding Control, Cab Air Pre-Cleaner, Heated Side Mirrors, Rear View Camera, Fuel Heater, Wheel Chocks, Central Lubrication, Rated at 598 HP,
Weight 80,000 LBS.
Repair/Condition Report:
When unit arrived in yard, MEL had local CAT dealer complete the following:
Strip machine for power washing
CAT TA inspection
Update ECM flash files
Cut open all filters & inspect for contaminates - all clean
Service engine
Inspect magnetic plugs/screens & suction screens - all clean
Check oil levels
Inspect oils for discolouration
Check for logged & active codes & repair
Completed the following pressure checks to ensure within OEM spec;
Engine rpm high & low idle
Engine oil high & low idle pressures
Fuel pressure
Full stall boost
Full stall speed
Transmission pump pressure
Transmission lube pressure
Steering pressure check
Steering high pressure cut-off
Hoist relief pressure
Brake cut-in/cut-out pressure
Based on inspection, MEL completed the following repairs;
Installed NEW front brake pads & rotors
Installed NEW duo cone seal on front left wheel hub
REBUILT right rear brakes w/ all NEW plates & friction discs
Left rear brakes removed, cleaned & inspected & resealed
Installed NEW duo cone seal on rear wheel ends
Replaced all required brake hoses/lines
Installed NEW pins & bearings on rear suspension cylinders
Right rear suspension sensor broken - replaced sensor
Installed NEW transmission output shaft seal
Transmission filter joint coupler leaking - replaced coupling
Installed NEW oil drain line on turbo
Serviced DPF - field cleaned
Serviced emission system w/ NEW filter, DEF injector & spark plug
Replaced all required w/ NEW coolant lines
Installed NEW a/c compressor, accumulator & dryer
Replaced required hydraulic lines
Replaced required powertrain lines
Line bored rear box mount bores
Installed NEW box mount pins & bearings
Steering cylinders have play at barrel end - installed NEW tie rods
Line bored rear axle A-frame bore
Installed NEW pin & bearing in A-frame
Installed NEW pins & bearings in rear axle stay arm
Completed required cosmetic & welding repairs
Box bed was inspected & repaired as needed
Machine is ready to go to work.