2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    2021 XCMG XE215DA New 履带式挖掘机2021 XCMG XE215DA New 履带式挖掘机
    照片(16)

    2021 XCMG XE215DA

    履带式挖掘机
    CNY ¥598,526 
    输入的价格为: USD $82,000

    Shanghai Tianyi Machinery Co. Ltd

    联系人:Elyn Lee

    Jinshan, 中国 201505

    常规

    年限
    2021
    制造商
    XCMG
    型号
    XE215DA
    小时
    0
    序列号
    XUGA2151LMKA08647
    状况
    新建
    描述
    We also have many new machines of XCMG CAT Doosan Location:shanghai China Place of Origin:Jiangsu, China Brand Name:XCMG Condition:New Engine Brand:YANMAR Moving Type:Crawler Excavator Operating Weight:21900 Ton Bucket capacity:1.05m3 Power:135kW/2050rpm Maximum Digging Height:9620mm Maximum Digging Depth:6680mm Machine Weight:21500 kg Max Digging Radius:9940mm Rated Speed:11.8r/min Warranty:1 Year XE215DA is an upgraded model of the D series with a new generation of hydraulic system, which has the characteristics of flexibility, good control performance, low fuel consumption, high construction efficiency, large digging force, and a wide range of applications. It can be equipped with multifunctional attachments to realize various operations such as crushing, shearing, cleaning, compaction, milling, pushing, pinching, grabbing, shoveling, loosening, hoisting and so on. 1. A new generation of high-efficiency hydraulic system, main pump, main valve, and electronic control stick are adopted. 2. The Optimization of internal structure of the main valve has reduced the impact of stick start/stop and boom start/stop. 3. Large-bore bucket cylinder and stick cylinder are used to increase the digging force by more than 5%. 4.Special low-speed high-torque engine, large-displacement pump, a new independent control system for the sub-cylinder has been developed to realize the precise distribution of main pump power. 5. Compared with XE215D, the efficiency of XE215D is increased by 7%, the fuel consumption is reduced by 10%,and the comprehensive fuel consumption is lower than 12L/H. 6. The bucket capacity has increased to 1.05m³, and the work efficiency is higher.