Deskripsi
This machine is a D6 XL WH with NEUTRAL Hours: 3890, CAT C9.8 ACERT Engine, Engine Block Heater, Automatic 4 Speed Transmission, Cab (ROPS) with A/C, Differential Steer, Engine Air Pre-Cleaner, Waste Handling (Landfill) Arrangement, SALT Undercarriage, 24" Trapezoidal Shoes, Final Drive Seal Guards, Pivot Shaft Seal Guards, SU Blade With Trash Rack, Automatic Reversing Fan, Drawbar, Fuel Tank Guards, Heavy Duty Bottom Guards, CAT Slope Indicate, LED Flood Light Arrangement, Ripper Ready
Ansul Fire Suppression, Powered Cab Pre-Cleaner, Rated at 255 HP, Weight 54,000 LBS.
Repair/Condition Report:
The following are repairs completed by the CAT Dealer prior to Marcel Equipment owning the machine;
At 513 hours, performed 500 hour service
At 1,032 hours, performed 1,000 hour service
At 1,491 hours, performed 500 hour service
At 2,094 hours, performed 2,000 hour service
At 2,513 hours, performed 500 hour service
At 3,091 hours, performed 1,000 hour service
At 3,538 hours, performed 500 hour service
At 4,051 hours, performed 2,000 hour service
At 4,542 hours, performed 500 hour service
At 5,071 hours, performed 1,000 hour service
At 5,580 hours, performed 500 hour service
At 5,651 hours, performed DPF service & valve set
At 5,651 hours, installed NEW DEF injector & spark plug
At 5,651 hours, installed NEW thermostat
At 6,048 hours, performed 2,000 hour service
At 6,305 hours, performed update for condenser fans
At 6,305 hours, REBUILT both lift cylinders
At 6,543 hours, performed 500 hour service
At 6,719 hours, installed NEW a/c condenser
At 6,875 hours, installed NEW injector wiring harness
At 6,913 hours, installed NEW DPF pressure sensors
At 7,046 hours, performed 1,000 hour service
At 7,083 hours, installed NEW ARD head & spark plug
At 7,358 hours, installed NEW undercarriage
At 7,414 hours, installed NEW engine ECM
At 7,502 hours, performed 500 hour service
At 8,048 hours, performed 2,000 hour service
At 8,261 hours, installed NEW parking brake solenoid
At 8,261 hours, installed NEW NOX sensors
At 8,261 hours, installed NEW DEF manifold
At 8,510 hours, performed 500 hour service
At 8,792 hours, replaced oil cooler
At 8,792 hours, REBUILT transmission oil pump
At 8,792 hours, REBUILT transmission
At 8,792 hours, REBUILT torque converter
At 9,027 hours, performed 1,000 hour service
The following was completed by Marcel Equipment;
Upon arrival to our yard, machine was stripped for power washing
Machine was inspected visually & operationally
Engine oil filter was cut open - clean
Transmission filter was cut open - clean
Hydraulic filter was cut open - clean
Magnets & suction screens checked - clean
Final drive oils were checked - levels good & oils clean
Engine was serviced
Transmission, hydraulic & final drive oils were changed
Replaced DEF pump & tank filters
The following pressures were taken to ensure within OEM spec;
Engine low/high RPM
Stall speed
Engine oil pressures - high/low
Fuel pressure
Engine boost
Transmission pump pressure - high/low
Transmission lube pressure - high/low
Torque converter inlet & outlet - high/low
Lock-up clutch pressure
Pilot pressure
Main relief pressure
Steering stand by pressure
Brake pressures
Accumulators
Fan speed - max/min
Steering cut-out
The following repairs were completed by Marcel Equipment;
Completed bearing roll-in for main & rods
Engine oil pump disassembled, inspected & resealed
Resealed engine oil pan
Installed NEW a/c dryer
Replaced required hoses/lines
Installed NEW window spray nozzles
Installed NEW DEF injector
Installed NEW DEF manifold
Installed NEW bearings for lift cylinder yoke mounts
Had DPF filter field cleaned
Removed & cleaned engine pre-cleaner
Installed NEW track cannon seals
Disassembled, inspected & resealed final drives
Installed NEW final drive seal guards
Resealed starter motor
Tightened blade joints where required w/ NEW pins & bearings
Calibrated blade
Installed belly pans
Completed required cab repairs
HVAC system cleaned & serviced
Batteries tested & connections serviced
Completed required cosmetic & welding repairs
Complete machine was sand blasted, primed, painted & new decals applied
Fire suppression will be certified before shipment
Machine has been completed & is work ready!
Exterior
ROPS
Enclosed