CORSAIR NOT SPECIFIED Used Drill Rigs Oilfield Equipment for saleCORSAIR NOT SPECIFIED Used Drill Rigs Oilfield Equipment for sale
    Photos(1)

    CORSAIR NOT SPECIFIED

    Drill Rigs Oilfield Equipment
    KRW ₩600,264,319 
    Price entered as: USD $415,000

    Seller Information

    View Seller Information

    Free Oilfield Quote

    Contact:Will Veasey

    Austin, Texas, USA 78746

    General

    Stock Number
    76993083
    Condition
    Used
    Description
    W3284C Corsair Crane Carrier Workover Rig Location: USA Type: Used Condition: Good W3284C Corsair Crane Carrier Workover Rig Description • Series 60 Detroit Diesel • 3180 Allison transmission • 96ft- 215,000lb mast • 42X12- 42X8 Drawworks Uses of W3284C Corsair Crane Carrier Workover Rig Workover rigs are used to perform maintenance, repair, and enhancement operations on an oil or gas well. Some common uses of workover rigs include: Well completion: After drilling a well, a workover rig is used to complete the well by installing production tubing, a wellhead, and other equipment necessary to start production. Well intervention: Workover rigs are used to perform operations on the well to improve production rates or to diagnose and fix issues. This can include acidizing or fracking the well, removing obstructions, or repairing damaged equipment. Well abandonment: When a well is no longer productive or safe to operate, a workover rig can be used to plug the well and abandon it. Well stimulation: Workover rigs can be used to perform well stimulation operations, such as hydraulic fracturing, which increase the flow of oil or gas from the well. Workover operations: Workover rigs can be used to perform a variety of maintenance and repair operations on the well, such as replacing tubing, repairing or replacing pumps, and replacing valves or other equipment.